Description
When an off-the-shelf panel doesn’t fit the job, MEK engineers and builds switchgear to the client’s own specification and standards. The in-house team handles design, AutoCAD and single-line diagram (SLD) drawings, and load calculations for safe, compliant and efficient designs. MEK also supports installation on site and provides after-sales service. Because MEK also makes cable management, cabinets and enclosures, a whole electrical scope can come from one manufacturer, with one point of accountability.
Key Features
- Panels built to client specifications and standards
- In-house design and engineering
- AutoCAD and single-line diagram (SLD) drawing support
- Load calculation assistance
- On-site installation support and after-sales service
- Precision CNC-manufactured enclosure for accurate cutouts, cable entries and a consistent fit
- Galvanised steel base material with a powder-coated finish for long-term corrosion resistance
- IP65-rated enclosure up to 2.0 mm thick, with a lockable door
- Completely customisable to the project’s ratings, layout and cable entry
Technical Specifications
- Lead time: Typically 3–5 weeks for a custom panel; 5–8 weeks for custom or large outdoor enclosures. ATS panels and lighting DBs are usually faster.
- Voltage: Low voltage
- Base material: Galvanised sheet steel, up to 2.0 mm
- Manufacturing: Precision CNC cutting and bending
- Finish: Powder coated
- Protection rating: IP65
- Mounting: Standard
- Configuration: Completely customisable
Applications
- Factories and processing plants with non-standard electrical layouts
- Commercial and institutional buildings built to a consultant’s specification
- Solar, generator and pumping projects needing purpose-built panels
- Contractors who want panels, cable management and enclosures from one supplier
Benefits
- Single point of accountability for panels, cable management, cabinets and enclosures
- Tighter delivery coordination across a full electrical scope
- Quality and compliance built to international standards
Frequently Asked Questions
How long does a custom panel take?
Typically 3–5 weeks for a custom panel and 5–8 weeks for custom or large outdoor enclosures. Standard ATS panels and lighting DBs are usually quicker.
What do I need to send for a quote?
A single-line diagram or a load list is ideal. If you don’t have one, MEK’s team can help prepare drawings and load calculations.
Do you deliver outside Uganda?
Yes. MEK Uganda delivers across Uganda and to all East and Central African countries, including Kenya, Tanzania, Rwanda, Burundi, South Sudan and the DR Congo.
To request a quotation or technical consultation, contact MEK Uganda at sales@mek.co.ug.


